Taber Building

New Bedford, MA Scope: Schematic Design through Construction Administration. Completion Date: 2004 Project Description: The historic Taber Building, located in Downtown New Bedford was built in 1924. In 2004 the renovations were completed, converting the one time grocery store and inn into 3,600 square feet of rentable commercial space and […] Read more »

Popes Island Commercial / Restaurant

New Bedford, MA Scope: Schematic Design through Construction Administration. Completion Date: June 2009 Project Description: An existing structure was demolished to make way for a new commercial building. The structure designed to fit on the existing foundation. The new building takes advantage of the waterfront site as well as the […] Read more »

Dartmouth Dodge

Dartmouth, MA Scope: Schematic Design through Construction Administration. Completion Date: 2005 Project Description: This new showroom building was built on the existing foundation of the previous McDonald’s fast food restaurant. The showroom serves as an auxiliary facility to the main building located on the adjacent lot. The truck center has […] Read more »

Beverly Yacht Club

Marion, MA Scope: Schematic Design through Construction Administration. Completion Date: 1999 Project Description: Founded in 1872, this yacht club is one of the oldest in the United States. The 1999 addition added extra dining room space under a three seasons covered porch, and a renovation to the interior of the […] Read more »

Back Nine

Lakeville, MA Scope: Schematic Design through Construction Administration. Completion Date: May, 2012 Project Description: The addition and alteration project to the Back Nine Clubhouse was for a new 29’ x 33’ addition which included a new upper level kitchen facility that tripled the existing capacity. Expansion of the dining area […] Read more »

Victoria Riverview

New Bedford, MA Scope: Master Planning, Conceptual Design & Permitting Project Description: Victoria Riverview Development is the adaptive re-use of an existing mill building into a mixed use residential – commercial space. The new three-story lobby transforms the building into a vibrant and inviting space. The interior rehabilitation includes loft-style […] Read more »

Riverside Landing

New Bedford, MA Scope: Conceptual Design Project Description: Stephen Kelleher Architects, Inc., in conjunction with Prime Engineering, Inc., and Highway view, LLC., designed, permitted, and have started construction of phase II of the Market Basket, Riverside Landing development in the city of New Bedford’s Fairhaven Mills overlay district. Stephen Kelleher […] Read more »

Sunrise Bakery

Dartmouth, MA Scope: Schematic Design through Construction Administration. Completion Date: 2001 Project Description: The Sunrise Bakery is a long established local business with locations in New Bedford and Dartmouth. Renovations have been completed at 571 Dartmouth Street, South Dartmouth, MA. The renovation focus was primarily to upgrade the business image […] Read more »

Humane Society and Shelter

Dartmouth, MA Scope: Schematic Design through Construction Administration. Duration: 1999-2002 Project Description: The design for the New Bedford Animal Rescue League called for panelized construction as an alternative construction method, using pre-engineered wall sections, built in factory controlled conditions and shipped to the site for final construction. With excellent quality […] Read more »